01 / PLANNING

Write the minimum operating requirement

List the applications that must continue, who uses them and what interruption is acceptable. Identify traffic that can be limited during an outage. This creates a testable scope instead of an undefined promise that the entire business stays online.

02 / PLANNING

Assign responsibility before changing settings

The owner of the firewall or router should approve the handoff and configuration. Some applications depend on network identity, remote access arrangements or provider-specific behavior. The responsible IT professional should assess these requirements before the secondary circuit is connected.

03 / PLANNING

Perform an agreed acceptance exercise

During an approved window, simulate primary-link failure, observe the switch, test named applications and restore the normal connection. Separately review power for the terminal, router, switches and essential devices. Keep a dated record of results and limitations with the equipment handover.

What to include in your project brief
Part of the projectInformation that helps
Before installationApplication list, network owner and equipment compatibility
During acceptanceFailover, essential workflow checks and restoration
After handoverAccount ownership, fault contact and review responsibility