RNP BUSINESS GUIDES / Keeping work moving

What does Starlink’s business SLA actually cover?

THE SHORT ANSWER

Starlink’s Priority SLA is a conditional network-availability commitment for eligible service, not a guarantee that every business application stays online. It specifies 99.9% monthly Network Availability and excludes Mini kits. Check the covered equipment, measurement boundary and exclusions, then design local power and network resilience separately.

01 / Keeping work moving

What is the vendor measuring?

The current SLA covers eligible Local and Global Priority lines in Available cells. It measures the Starlink Kit-to-Point-of-Presence path while powered and active; continuous failures of at least 60 seconds count. Exclusions include Mini, Data Pools, Impact Plans and Bonded Gateways. Qualifying failure provides a 20% base-cost service credit under the terms. Power, obstructions, non-Starlink configuration and other stated exclusions matter.

Source: Starlink — Priority Plan Service Level Agreement.

02 / Keeping work moving

What does 99.9% mean as arithmetic?

Illustration of the percentage — not an outage allowance for your business

30 days × 24 hours × 60 minutes × 0.1% = 43.2 minutes

A hypothetical 30-day period contains 43,200 minutes. One tenth of one percent is 43.2 minutes. This calculation only illustrates the percentage; the SLA’s actual measurement rules and exclusions determine whether a service credit applies.

It does not mean a business is promised no more than 43.2 minutes of application downtime. A dead access point, failed local switch or unavailable cloud service can stop work without being the measured Starlink network failure. Keep these boundaries visible in a procurement comparison.

03 / Keeping work moving

Which availability questions remain with the project?

Separate the vendor commitment from the installation design
LayerQuestion for the buyer or installer
Starlink serviceIs this exact plan, kit and location eligible under the current SLA?
Site powerHow long does the required equipment remain powered?
Local networkWhat happens if the firewall, switch or access point fails?
Business applicationCan the vendor’s service and your authentication path be reached?
Operational recoveryWho receives the alert and restores usable work?

04 / Keeping work moving

How should two availability offers be compared?

Compare the measurement boundary, covered hours, exclusions, remedy and reporting procedure. Two services can advertise the same percentage while measuring different things. Save the dated terms used in the purchasing decision and identify any separate installation or managed-support agreement.

RNP recommends describing the business requirement in operational language alongside the contract: dispatch must resume within the agreed time, or a payment lane must have an approved fallback. Those requirements then become commissioning tests. They should not be inferred solely from a vendor percentage.

05 / Keeping work moving

What evidence should the company retain?

  1. The applicable SLA and plan confirmation from the purchasing date.
  2. Kit identification and a record of the approved installation position.
  3. Incident times with time zone, service observations and local power status.
  4. The current support contact and vendor reporting procedure.
  5. Separate records of application recovery and any service-credit request.

About this guide

RNP’s planning recommendations are separate from vendor specifications. Sources were checked on October 15, 2026; current plan terms, availability and account-specific offers can change. Illustrative calculations are not installation measurements. RNP confirms project scope, price and local delivery availability after assessment.

PLAN THE INSTALLATION

Turn the question
into a clear brief.

Tell us the availability requirement, intended hardware and local recovery process.

Request a project review ↗

Scope, location, price and availability are reviewed before work is accepted.